Renovation work
Extension of stands that stretch along the touchline
Once the pitch has been excavated and the athletics track removed, the lower tiers of the seating that runs along the touchlines will be adjusted and extended to bring it closer to the pitch, with the structure to be built on the piling previously assembled on the athletics track.
The adjusted seating will be placed on the aforementioned structure, which will bring spectators to within 8.5 metres of the pitch.
Meanwhile, the planting of the new turf to bring it up to the new level will continue.

