Renovation work
Dismantling and demolition of South Stand
The demolition of the South Stand will be carried out, whilst at the same time a separation will be introduced between the stands stretching along the touchlines and the stand behind the goal.
A security area will be installed around the separation points, with the construction site cut off by the security fencing in the South Stand.
The sections closest to spectators will be dismantled during the summer months or whenever there are no fixtures being staged at the stadium.

