Left arrow From August 2017 Renovation work Excavation and laying foundations of South Stand Excavation work will be carried out to enable the construction of the foundations of the South Stand. This stage will see the South Stand foundations piles, walls and slabs built. Close Drag to see the processLeft arrow Right arrow Right arrow