The new turf has been laid at the Reale Arena. Real will host its first game on new turf field vs SD Eibar on Saturday. Once the match vs SD Eibar has been played, the final hybrid pitch will be installed. Hybrid grass is natural turf reinforced with polyethylene fibres, installed with injection technology. The company in charge of the installation is SIS PITCHES (Great Britain) and the work will be done in 9 or 10 days, from 2 to 10 December. The new pitch will be in perfect condition for the clash against FC Barcelona on December 14.
